RESOURCES

ESCATEC BLOG

Join our subscribers

News, articles, industry insights and more straight to your inbox.

Filter by topic

Total 8 Pages

Go To Page

Go

How long should a value engineering (VAVE) project take?

How long should a Value Engineering (VAVE) project take and what should it ...

The value of outsourcing product design to an EMS provider

Many Original Electronics Manufacturers (OEMs) choose to outsource ...

Value engineering: cutting supply chain costs not product quality

Value engineering seeks to reduce costs and increase the value of a product. ...

How VA/VE ‘follows the money’ to deliver more value to your customers

‘Follow the money’ has always been a handy investigative tip. And it’s one ...

7 cost-saving ideas for manufacturers & 1 that works

Who doesn’t want to reduce costs? Reduced costs lead to either increased ...

When’s the right time to start a value engineering process?

Products can be ’value engineered’ during any of the three stages of the ...

Value Engineering for OEMs: 7 myths debunked!

Value Analysis and Value Engineering (VA/VE) is a practice that’s often ...

Is component obsolescence in electronics manufacturing inevitable?

Component obsolescence is an occupational hazard for OEMs as they battle to ...

Obsolescence management: overcoming the pain of obsolete components

At some point in the future it’s highly likely that an electronic component ...

How to select X-ray inspection equipment for electronics manufacturing

Whichever part of the electronics industry you are involved in, you're probably ...

Total 8 Pages

Go To Page

Go
resources-group-med